44 research outputs found
Redundancy, Deduction Schemes, and Minimum-Size Bases for Association Rules
Association rules are among the most widely employed data analysis methods in
the field of Data Mining. An association rule is a form of partial implication
between two sets of binary variables. In the most common approach, association
rules are parameterized by a lower bound on their confidence, which is the
empirical conditional probability of their consequent given the antecedent,
and/or by some other parameter bounds such as "support" or deviation from
independence. We study here notions of redundancy among association rules from
a fundamental perspective. We see each transaction in a dataset as an
interpretation (or model) in the propositional logic sense, and consider
existing notions of redundancy, that is, of logical entailment, among
association rules, of the form "any dataset in which this first rule holds must
obey also that second rule, therefore the second is redundant". We discuss
several existing alternative definitions of redundancy between association
rules and provide new characterizations and relationships among them. We show
that the main alternatives we discuss correspond actually to just two variants,
which differ in the treatment of full-confidence implications. For each of
these two notions of redundancy, we provide a sound and complete deduction
calculus, and we show how to construct complete bases (that is,
axiomatizations) of absolutely minimum size in terms of the number of rules. We
explore finally an approach to redundancy with respect to several association
rules, and fully characterize its simplest case of two partial premises.Comment: LMCS accepted pape
Large-scale unit commitment under uncertainty: an updated literature survey
The Unit Commitment problem in energy management aims at finding the optimal production schedule of a set of generation units, while meeting various system-wide constraints. It has always been a large-scale, non-convex, difficult problem, especially in view of the fact that, due to operational requirements, it has to be solved in an unreasonably small time for its size. Recently, growing renewable energy shares have strongly increased the level of uncertainty in the system, making the (ideal) Unit Commitment model a large-scale, non-convex and uncertain (stochastic, robust, chance-constrained) program. We provide a survey of the literature on methods for the Uncertain Unit Commitment problem, in all its variants. We start with a review of the main contributions on solution methods for the deterministic versions of the problem, focussing on those based on mathematical programming techniques that are more relevant for the uncertain versions of the problem. We then present and categorize the approaches to the latter, while providing entry points to the relevant literature on optimization under uncertainty. This is an updated version of the paper "Large-scale Unit Commitment under uncertainty: a literature survey" that appeared in 4OR 13(2), 115--171 (2015); this version has over 170 more citations, most of which appeared in the last three years, proving how fast the literature on uncertain Unit Commitment evolves, and therefore the interest in this subject